Updated 11 November 2026. Compiled by the Dholera Guide desk from the sources listed at the end of this page.
Today the fastest way to reach Dholera is a car or taxi on the Ahmedabad-Dholera Expressway, reported at about 40 minutes to 1 hour for roughly 100 km. Older state roads take about 2 to 2.25 hours. Bus times vary. Rail is targeted for 2030 to 2031, and the Dholera airport has not opened as of 11 November 2026.
| Rank | Way to reach Dholera | Reported time from Ahmedabad | Status on 11 November 2026 |
|---|---|---|---|
| 1 | Car or taxi on the Ahmedabad-Dholera Expressway | About 40 minutes to 1 hour | Open. 109 km, 4 lanes, access-controlled, inaugurated 31 March 2026 |
| 2 | Car on the older state roads through Dhandhuka | About 2 to 2.25 hours | Existing roads, slower |
| 3 | Bus or shared vehicle | Longer than a car, varies by service | Depends on available services; no time stated in the record |
| 4 | Flight to Dholera International Airport | Not applicable yet | Not open. Expected by the end of 2026 per the 16 October 2026 state review; no licence or airline schedule reported |
| 5 | Semi-high-speed rail | About 45 minutes (press figure, not stated by PIB) | Not operating. Approved 13 May 2026, completion targeted up to 2030 to 2031 |
This is the way almost every visitor reaches Dholera today. The road is access-controlled, so there are no signals or crossings. The time is reported as a range because sources differ. Add time at both ends depending on where in Ahmedabad you start and which part of the region you are visiting.
A trial landing took place on 4 June 2026, which shows the runway can be used. It does not mean the airport is open. At the Chief Minister's review on 16 October 2026 officials said it is expected to be operational by the end of 2026. Until it opens, flights land at Ahmedabad airport and the trip continues by road.
The rail line would link Ahmedabad, Dholera SIR, the airport and Lothal. The Press Information Bureau release states the cost, the length and the timeline. The speed and journey time are press figures. No construction start has been reported as of 11 November 2026.
If you are planning a visit this month, only the first two ways are real options, and the first is the one to choose. Fly or take a train to Ahmedabad, then go by road. The last two rows are included so that a claim you read about a Dholera flight or train can be compared with the record.
Travel time depends on traffic and your starting point in Ahmedabad. The figure in the table is a reported range, not a guarantee.
This list ranks travel time from Ahmedabad only. It does not give times from other cities, the cost of each option or the schedule of any bus service.
A car or taxi on the Ahmedabad-Dholera Expressway, reported at about 40 minutes to 1 hour for roughly 100 km. Before the expressway the same trip took about 2 to 2.25 hours on ordinary roads.
Not yet. There is no passenger station inside Dholera SIR. A semi-high-speed rail line was approved on 13 May 2026, with completion targeted up to 2030 to 2031.
Not yet. Dholera International Airport has not opened as of 11 November 2026. Officials said on 16 October 2026 that it is expected to be operational by the end of 2026. For now, fly to Ahmedabad and travel by road.
About 100 km to the south-west by road. The expressway itself is 109 km long. The distance has not changed. The travel time has, because the road is access-controlled.