Updated 11 November 2026. Compiled by the Dholera Guide desk from the sources listed at the end of this page.
We found no published toll rate for cars on the Ahmedabad-Dholera Expressway as of 11 November 2026. What exists is a notification issued on 1 May 2025 that set a toll formula for a 23 km stretch near Dholera, with a plaza planned near Bhadbhid village. The expressway was inaugurated on 31 March 2026. Whether tolls are being collected is not stated in the reports.
On 1 May 2025 the Ministry of Road Transport and Highways issued a notification setting a toll formula for two stretches. One is about 23 km of National Expressway 8, the Ahmedabad-Dholera Expressway, from near the Dholera interchange to the Adhelai interchange. The other is about 30 km of National Highway 751, from Nari Junction near Bhavnagar to Adhelai. DeshGujarat reported the notification on 6 May 2025. NHAI is to manage both stretches and collect tolls at a plaza near Bhadbhid village in Bhavnagar district once tolling begins.
The report does not print per-vehicle rates, an exemption list or a start date for tolling. A toll formula is not the same as a rate card for each vehicle class.
Broker and developer blogs sometimes print toll figures. We do not use them, because none cites a notification.
Reports say the national fee rules were amended with effect from 15 February 2026 and describe a lower rate for a stretch of expressway that is open while the rest is still under construction. We could not read the amended rules for this page, so we do not know whether or how they apply to this road. Check the NHAI notification before relying on it.
For the road itself, see our expressway guide. For travel time, see Ahmedabad to Dholera distance.
We found no published car toll rate as of 11 November 2026. A notification of 1 May 2025 set a toll formula for a 23 km stretch of NE-8 near Dholera, but the report on it prints no per-vehicle rates. Check NHAI for the current figure.
The reports we found do not say. A December 2025 report said no toll was being collected before the official opening. After the inauguration on 31 March 2026 we found no report stating whether tolls are being collected.
The May 2025 notification report names a plaza near Bhadbhid village in Bhavnagar district, to collect tolls once tolling begins. It does not name a plaza on the Ahmedabad side of the expressway.
Tolls on national highways are collected through FASTag, so keep one active. Whether this road is already collecting tolls is not confirmed in the reports we found.