A first Dholera site visit: seven checks in the order of the day

Updated 11 November 2026. Compiled by the Dholera Guide desk from the sources listed at the end of this page.

Check the project's GujRERA registration before you leave Ahmedabad, drive the expressway, see the Activation Area, then stand at the exact plot with the survey number. Ask whether it is inside the SIR and inside a town planning scheme, and look up its record afterwards. Fuel up and carry water, since roadside services are limited.

How this list is rankedThese seven checks are ordered in the sequence of a one-day visit, not ranked by importance. Each one comes from a fact in this site's guides or the fact base: the registration rule, the expressway, the Activation Area figures, the boundary and town planning scheme rules, the land record and the registration steps.

The checklist

OrderCheckWhat to look forWhere to read more
1Registration, before you leaveThe project's GujRERA registration number and status on the official portal. Plotted developments must register before marketing/dholera-rera-guide
2The drive inThe 109 km expressway: access-controlled, no signals. Keep FASTag active, fuel up and carry water/ahmedabad-dholera-expressway
3The Activation AreaAbout 22.5 sq km inside Town Planning Scheme 2: the built part of the region, with about 72 km of internal roads reported by DICDL/dholera-activation-area
4The exact plotStand on the plot with the survey number and the seller's drawing. Ask for the final plot number, not a general area name/dholera-title-verification-712-extract
5Inside or outside the SIRWhether the plot lies inside the region and inside a town planning scheme, as a marketing map is not a boundary/dholera-map-guide
6The land recordThe 7/12 extract: the owner's name, the area and any encumbrance. Check non-agricultural status/na-conversion-agricultural-land-gujarat
7The paperwork afterwardsStamp duty of 4.9 per cent and registration of 1 per cent, and the steps at the sub-registrar office/dholera-stamp-duty-registration

Why the paperwork check comes first

A visit is easy to arrange and hard to undo. Looking up the registration number on the GujRERA portal takes a few minutes before you leave. If a project cannot give a registration number, or the number does not show the project you were told about, you have learned that without a trip. The GujRERA portal is at gujrera.gujarat.gov.in.

What you will and will not see on the ground

The Activation Area is the part of Dholera where roads and utilities have been built. Outside it, most of the region is still open land. The Tata semiconductor fab is under construction. The Dholera airport has not opened. Setting expectations before you go avoids confusing a plan on a brochure with what exists in November 2026.

Questions to carry with you

We do not publish plot prices. The only land rates we cite are government rates, with their date.

What this list cannot tell you

This checklist does not tell you whether a given plot has a clear title, what it is worth or when its surroundings will be built. Have a lawyer check the title for the exact plot.

Questions people ask

What should I check on a first visit to Dholera?

Before you go, check the project's GujRERA registration. On the ground, see the Activation Area and stand at the exact plot with its survey number. Afterwards, look up the land record and have a lawyer check the title. Take fuel and water, since roadside services are limited.

Can I visit the Tata semiconductor fab site?

The fab is under construction and our record does not list public visits. Ask the authorities before planning to see it. What you can see from public roads depends on current site arrangements.

How long does a Dholera visit take from Ahmedabad?

The drive is reported at about 40 minutes to 1 hour each way on the expressway, so a day trip is possible. The region covers about 920 sq km, so choose your places in advance.

Is the whole of Dholera built?

No. The Activation Area of about 22.5 sq km has roads and utilities built. The rest of the 920 sq km region is planned in phases over about 30 years.

Read next

Sources

  1. GujRERA project register (checked 11 November 2026)
  2. Official Dholera portal (DSIRDA and DICDL) (checked 11 November 2026)
  3. AnyROR, Gujarat land records (checked 11 November 2026)